How to Install and Adjust 25T/D Rice Mill Production Line
The clients often will face installation and debugging problems when they have got the rice milling plant if they don’t have rice milling machinery using experience before. And how to adjust the machine well is very important to guarantee its good working condition. Today we will talk about 25 tons per day combined with rice mill equipment installation and adjusting.Get more news about Complete Set Rice Production Line,you can vist our website!
Rice milling plant adjusting
First, Control the middle adjusting screw of the gravity screen between 105-115. It depends on the coverage of brown rice on the sieve. If there are too many materials in the upper part, increase the length of the screw rod appropriately. If there is more material in the lower part of the screen surface, shorten the screw rod.
Second, When the rice milling plant is turned on, open the gate to the maximum to allow the material to enter the destoner machine quickly. Adjust the gate according to the output during processing.
Third, Before the brown rice feeds into the rice whitener, close the brown rice gate and open the return gate. Open the brown rice gate after the sieve is covered fully with brown rice.
Forth, During processing, adjust the brown rice adjusting plate according to the condition of the brown rice on the sieve to ensure that no rice enters the rice whitener.
Fifth, Paddy rice separator operation at the end of rice mill equipment processing:
(1) When the paddy going to the destoner is finished, turn off the destoner machine, otherwise the paddy will come out of the stone mouth. At this time, look at the material in the hulling machine hopper. If there is no stock, close the return gate of the paddy separator. And according to the brown rice on the sieve, adjust the brown rice adjustment board upward.
(2) When the material on the sieve surface is about to end, close the brown rice gate, pull down the gate of the hoist to enter the paddy separator, let the materials flow into the hulling machine, increase the pressure of the hulling machine appropriately, and wait until the rice is peeled. Open the gate and let the material enter the rice machine from the hose for processing.
Second, the Rice huller machine
1. The oil filling amount in the gearbox is 0.5-0.6 kg, and it is replaced once a month.
2. When the fast roller rubber layer wears to about half, fast and slow can be used interchangeably. When the wear of the rubber roller will expose the iron core, the new rubber roller should be replaced. The two rollers should be replaced at the same time. The surface of the rubber roller should be kept flat. Find out the cause in time, repair and replace it. Pay attention to checking the parts such as drain plate, transmission gear, etc., if they are worn, they should be repaired and replaced.